Trumpington Meadows
Value£1.2m
TimeScale43 weeks
About
MJS Construction (March) Ltd were contracted by Willmott Dixon to complete the groundworks, concrete raft slab and external hard landscaping elements of a new Secondary School in Trumpington, Cambridge . MJS were integral on this project to the development of the raft slab details which were then utilised in standard format across numerous framework projects. Large diameter concrete drainage was installed along with an attenuation pond to control surface water run-off. A high quality finish was then achieved to the external paving leaving a very satisfied client.